The Ostoja estate is being built in two stages comprising a total of 11 residential buildings with lifts as well as 5 garage halls.
At the first stage, complete already, 6 buildings with 138 well-laid out units and two self-sustaining above-ground garage halls with parking spaces were built.
At the second stage, now underway, 5 buildings and 3 garage halls, including one self-sustaining and two at the ground floor of the residential buildings, are planned. The estate is distinguished by an exceptionally cosy character and low-rise development not more than five levels high.
The planned date of the completion of construction of the second stage of the estate is 30 November 2022.